Well, there was some progress last week but it was difficult to notice in pictures therefore I didn't update you. Mitch has been hard at work using any free time he can find. The things that are now completed include:
- all the cement board has been installed (this is required when using tile)
- The closet doorway has been framed and is ready for the door that is in the garage.
- The seat in the shower has been built
- The floor pan in the shower has been created (thanks Gary!)
- The cracks in the floor and shower have been grouted.
- The heating system for my floor (smile) has been laid and electrically installed!
There is probably more but I am not aware of it all. We need to get our tile picked out and purchased yet this week as Mitch and Gary are planning to do the tiling this weekend. They should have ample time as Frances and I will both be gone and Gary is spending the weekend here!

This is a picture of my shower seat (behind the toilet). the toilet will be moved back to its rightful place soon!