- all the cement board has been installed (this is required when using tile)
- The closet doorway has been framed and is ready for the door that is in the garage.
- The seat in the shower has been built
- The floor pan in the shower has been created (thanks Gary!)
- The cracks in the floor and shower have been grouted.
- The heating system for my floor (smile) has been laid and electrically installed!


This is a picture of my shower seat (behind the toilet). the toilet will be moved back to its rightful place soon!
1 comment:
Wow! What a lot of work. It is so nice to have handy husbands.
Post a Comment